My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11881
DRMS
>
Back File Migration
>
Report
>
REP11881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/12/2001
Doc Name
2000 ARR & AHR TEXT
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />L_J <br />• <br />i. HYDROLOGIC MONITORING PLAN <br />Requirements <br />Colowyo has committed to a surface and groundwater monitoring plan sufficient to verify the <br />predicted effects of mining activities. Specifically the plan addresses the following: <br />1) Monthly flow and quality analysis for Goodspring Creek and Taylor Creek; 2) quarterly <br />groundwater level and quality analysis in updip and downdip minesite wells and a downdip <br />Gossazd rail loadout well. Results aze submitted to the Division of Minerals and Geology in an <br />Annual Report. Quarterly monitoring will, at a minimum, include chemical analysis of all <br />parameters listed below: <br />SURFACE AND GROUNDWATER (quarterly) <br />Phosphate <br />Conductivity at 25° C <br />Total Dissolved Solids (TDS) <br />Total Suspended Solids (TSS) <br />Mercury <br />Arsenic <br />Iron <br />Ammonia <br />Nitrate (Wells only) <br />Calcium <br />Bicazbonate <br />Magnesium <br />Selenium <br />Nitrate-Nitrite <br />SURFACE WATER (monthly) <br />pH <br />eC <br />Temperature <br />TSS <br />Flow <br />surface water- total recoverable <br />metals <br />pH <br />Lead <br />Manganese <br />Sodium <br />Sulfate <br />Zinc <br />groundwater -dissolved metals <br />Results <br />Colowyo continues to adhere to the approved hydrologic monitoring plan. Additional details of <br />this plan aze explained in the CDMG Permit, Volume 1, Section 4.05.13. Cumulafive data and <br />graphs for previous yeazs data as well as data for 2000, aze presented for this Annual Report in the <br />following exhibits: <br />Exhibit 1 - Goodspring Creek and Taylor Creek Water Data. <br />Exhibit 3 - Gossazd Well, North Goodspring Well and A-6 Well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.