Laserfiche WebLink
~~~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Daze: zronoo~ s nt r w i:0s weather: Swny Temp: 20-ss <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 6, I I S.O <br />TOTAL AREA TO DATE (SF) = 347,283.0 <br />BENTONI'rE FOR SLURRY TODAY (BAGSlrONS) = O.O / O.O <br />BENTONITE FOR SLURRY 7YJ DATE (BAf,S/1'ONS) = 718.0 1 1 U77.0 <br />BENTONITE FOR DRY ADDITTON TODAY (BAGSfrONS) = 6.O / 9.O <br />BENTONITE FOR DRY ADDITION TO DATE (BAGS~TONS) = 389.0 / $$3.5 <br />CEMENT FOR DRY ADpIT10N TODAY (1rAGSr7'ONS~ ().() ~.~ <br />CEMENT ADDITION TO BACKFTLL TO DATE (BAGSITONS}= ] 3 ].~ 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAY(r0 DATE) O / 4,366,541 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Grayer 220' <br />Dave finished trereh and dare backfdling at Ipm <br />Dug back to 125+80 to emure good [ie in at correct angle for slurry wall, completely dig plug left by trencher <br />Plant only pumped existing shary, ro water used at the pleat today. <br />Only area remaining to i~tall is m the pipeline break remediation area; not ready Yet <br />6. Safety: No Safety Issues. <br />CONIRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipment used, work performed and test cotducted diving this repor[iog period were m <br />strict compliance with the coraracl ptaas and specifica[iom except as noted. <br />Geo-Con <br />• Inspectod Engineer/ Owner <br />Page t of t <br />