Laserfiche WebLink
Geo-COO <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALb <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 2/8/2007 S M r W®F S Weather: overcast temp: 20-00 <br />7. Work Perfnrtnevl• Cnmmarv_ see addition atWrhell <br />AREA TODAY (SF) = I Z,O 1 O.O <br />TOTAL AREA TO DATE (SFl = 341, I68.O <br />HENTOMTE FOR SLURRY TODAY (BAGSfrON$)= O,O / 0.0 <br />BENTONITE FOR SLURRY TO DATE (BACSrI'ONS) = 7I S.O / 1077.0 <br />BENTONITE FOR DRY ADDI710N TODAY (BAGS/I'ONS) = 11.O / 16.5 <br />HENTONITE FOR DRY ADDITION TO DATE (BAGSfIONS) ~ 383.0 / $74.5 <br />CEMENT FOR DRY ADDITION TODAY (BAGSrI'ONS)= -O.O O.O <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGS/1'ONS)a 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAI. TODAYlI'O DATE) / 4,366,541 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer dug 470' <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTffICAT[ON: [ certify that the above report is complete and correct and that all <br />material and equipment used work perfomxd and test condaoted durvg this reporting period were in <br />strict compliance with the contract plays and specification except as noted. <br />Geo-Con <br />• inspector/ Engineer/ Owner <br />Page t of 1 <br />