My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-COO <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALb <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 2/8/2007 S M r W®F S Weather: overcast temp: 20-00 <br />7. Work Perfnrtnevl• Cnmmarv_ see addition atWrhell <br />AREA TODAY (SF) = I Z,O 1 O.O <br />TOTAL AREA TO DATE (SFl = 341, I68.O <br />HENTOMTE FOR SLURRY TODAY (BAGSfrON$)= O,O / 0.0 <br />BENTONITE FOR SLURRY TO DATE (BACSrI'ONS) = 7I S.O / 1077.0 <br />BENTONITE FOR DRY ADDI710N TODAY (BAGS/I'ONS) = 11.O / 16.5 <br />HENTONITE FOR DRY ADDITION TO DATE (BAGSfIONS) ~ 383.0 / $74.5 <br />CEMENT FOR DRY ADDITION TODAY (BAGSrI'ONS)= -O.O O.O <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGS/1'ONS)a 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAI. TODAYlI'O DATE) / 4,366,541 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer dug 470' <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTffICAT[ON: [ certify that the above report is complete and correct and that all <br />material and equipment used work perfomxd and test condaoted durvg this reporting period were in <br />strict compliance with the contract plays and specification except as noted. <br />Geo-Con <br />• inspector/ Engineer/ Owner <br />Page t of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.