My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAXSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 2/7/2007 S M T®R F S Weather: fay Temp: 22-02 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 2,520.0 <br />TOTAL AREA TO DATE {SF) = 329,1$8.0 <br />BENTONSTE FOR SLURRY TODAY (BAG3/1'ONS) = 6.O I 9.O <br />BENTOMTE FOR SLURRY TO DATE (BAfS?ONS) = 718.0 / 1077.0 <br />BENTONPFE FOR DRY ADD1770N TODAY (BAGS?ONS) = I.O / 1.$ <br />BENTONTTE FOR DRY ADDTTION TO DATE (BAGSITONS) = 372.0 / $$8.O <br />CEMENT FOR DRY ADDITION TODAY (BAGSITONS)a~ O.O O.O <br />CEMENTADDTTION TO BACKFH.L TO DATE (BACSffONSp 131.0 163.8 <br />WATER USAGE AT HATCH PLANT (GAL TODAY/FO DATE) / 4,366,$41 <br />• Z. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />Ixss Wan full sluff; mt all tests completed <br />4. Verbal Instructions Received: <br />$. Remarks: D. Greyer dur; 90' <br />Stopped slurry wall operation part of tbe day to have We operators help out ov remediation <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATTON: I certify that We above report is complete erd correct and Wet all <br />material and equipmem used, work performed and test conducted during this reporting period were m <br />strict complimce wiW We coNmct pleas and specification except es mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.