Laserfiche WebLink
~~~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-Q03 <br />Date: 2/6!2007 S ~ W R F S Weather: suety Temp: 22-54 <br />1, Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 9,240.0 <br />TOTAL AREA TO DATE (SF) = 326,638.0 <br />BENTONITE FOR SLURRY TODAY (BAGSl1'ONS) = I8.O / 27.0 <br />BENTONITE FOR SLURRY TO DATE (BAC,S?ONS) = 7I2.O / 1068.0 <br />BENTONITE FOR DRY ADDITION TODAY OtAGS/fONS) = S.O / 7.S <br />BENTONITE FOR DRY ADDrI70N TO DATE (BAGSlTONS) = 371.0 / 556.5 <br />CEMENT FOR DRY ADDITION TODAY (BACS/rONSp O.O ~ O.O <br />CEMENT ADDITTON TO BACKFTLL TO DATE (BAGSlrONS)= 131,0 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/r0 DATE) 102,900 / 4,366,541 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 330' <br />bailing out trench shvry to make sure it is m[ too heavy and we have good product to go m trench <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and cortect and that all <br />material and equipment used, work performed and test mtducted during this teportivg period were in <br />strict compliance with the contract p1arB aed speciScations except as mted. <br />Geo-Con ; <br />• Inspector/ Engineer/ Owner ; <br />Page 1 of 1 <br />