Laserfiche WebLink
(~~~ Geo-COR <br />• DAILX INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO, POS-003 <br />Date: 2/5!2007 S M T®R F S Weather: Srow Temp: -5-30 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 6, t 45.0 <br />TOTAL AREA TO DATE (SF) = 317,398.0 <br />BENTONITE POR SLURRY TODAY (BAGS/TONS) = I3,O / I9.S <br />BENTONITE FOR SLURRY TO DATE (BAGS!TON$) = 694.0 / I O4I.O <br />BENTONITE FOR DRY ADDITION TODAY (BACS!FONS) = 6.0 / 9.0 <br />BENTONITE FOR DRY ADDFfION TO DATE (BAGS/rONS) = 366.0 / 549.0 <br />CEMENT FOR DRY ADDITION TODAY (BAGS/TONS} O.O O.O - <br />CEMENT ADDI170N TO BACKFn,L TO DATE (BACSITONS~ I31.O 163.8 <br />WATER USAGE AT BATCR PLANT (CAL TODAY/f0 DATE) 87,100 / 4,263,641 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal InswMions Received: <br />5. Remarks: D. Gayer 220' <br />No profile taken, Trench slurry very thick. Trencher under slurry in this section. Diggir~ out a!1 of trench <br />and pushing backfil) toward machine. SMw sloppy process but it is workiag. Top out is 138+g0 <br />6. Safety: No Safety Issues. <br />CONTRACTOR CER77FtCAT10N: [certify that the above report is complete and correct and that a0 <br />material and equipmc~ used, work performed and lest conducted during ibis reporting perwd were in <br />strict compGaroe with the contract plam and specificatiotrs except as rated. <br />Geo-Con <br />Inspector/Engineer/ Owner <br />Page i of t <br />