My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-COB <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: t/31/2007 S M T lQ R F S Weather: Srmv Temp: -5-30 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF)= 3,665.0 <br />TOTAL AREA TO DATE (SF-= 3l 1,253.0 <br />BENTONITE FOR SLURRY TODAY (BAGSR'ONS) = 6.O / J.O <br />BENTONITE FOR SLURRY TO DATE (BAfSJT'ONS) = 6S I.O / ] O2I .$ <br />BENTONITE FOR DRY ADD1770N TODAY (BAGS?ONS) = 4.0 / 6.0 <br />BENTONITE FOR DRY ADDTTION TO DATE (BACSlfONS) = 360.0 / $40.0 <br />CEFfENT FOR DRY ADDITION TODAY (BAGSh'ONS~ 9.O 11.3 <br />CEMENT ADDITION TO BACKFII.L TO DATE (BAGS.rrONS~ 140.0 175.0 <br />WATER USAGE AT BATCH PLANT GAL TODAYlrO DATE) 92,400 / 4,I7S,741 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less dtan full shift; mt all tests wmpleted <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 11 S' <br />having to dig out plug left by trencher at 138+70 tud 138+60 <br />trertch is full of goop, trying to bad out soup and fill with good stiff backf7l. Section that undermined <br />wh0e coder the trencher was digging dry between ]+20 and 0+00 is startutg to uodermhte and causing the soup <br />Bottom of key based on combitmtion of seeing key at plug & boring log <br />Unable to get accurate measurements on backltll profile. Emire trench cleaned out to original depth before <br />diggittg this morning. Too cold to mix slurry or backfill from 2/1 to 2/4. Next production day is 2/5/07 <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete aM correct and that all <br />material and equipment used, work performed and test conducted during this repotting period were m <br />strict compliance with [he con[mct plans amd specifications except as rated. <br />Geo-Con <br />Inspector/ Engineed Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.