My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: t/l 112007 S M T W®F S Weather: Suarry Tentp: 3-21 <br />1. Work Performed: Summ ,see addition attached <br />AREA TODAY (SF) = O.O <br />TOTAL AREA TO DATE (SF) = 307,588.0 <br />BENTONITE FOR SLURRY 70DAY (BAG.WfON3) = O.O / O.O <br />$ENTONITE FOR SLURRY TO DATE (BAGSrI'ONS) = 62S.O / 937.5 <br />BENTONITE FOR DRYADDTP[ON TODAY (BAGSrfONS)= 4.0 / 6.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BACSrI'ONS) = 3S3.O / S29.S <br />CEMENT FOR DRY ADDITION TODAY (BAGSfrONSp O.O O.O <br />CEMENT ADDITION TO BACKFILL TO DATE (BAC~l1'ONSp 13I.O 163.8 <br />WATER USACE AT BATCH PLANT (GAL TODAY/r0 DATE) 37,600 / 4,033,641 <br />• <br />2. Results of Inspection: <br />3. Tests Required by Plans and/or Specs and Results: <br />See Attached <br />4. Verbal Instructions <br />5. Remarks: D. Gayer 0' <br />D. Wrea dug 0' <br />No digging today, D. Gayer clued out trench and topped off completely. <br />Treroher dida4 want to dig, undemtirdng around the machine, discussed putting i[ trader slurry, awaiting <br />decisioa <br />6. Safety: xo Safety Issues. <br />CONTRACTOR CERTTFICATION: 1 certify that the above report is complete and correct and that all <br />material and equipmem used, work performed aad test conducted during this reporting period were in <br />strict compliance with the comma plans aad specification except n rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page t of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.