My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br />• <br />DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. P05-003 <br />Date: 1/10/2007 S M T ®R F S Weather: Sunuy Temp: 17-52 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (S~ _ ~ Z,$1 O.O <br />TOTAL AREA TO DATE (SF) = 307,588.0 <br />$ENTONITE FOR SLURRY TODAY ($AGS/I'ONS) = S.O / 7.S <br />BENTOMTE FOR SLURRY TO DATE (BACS/fONS) = 6ZS.O / 937.5 <br />BENTONI'rE FOR DRY ADDrfION TODAY {BAGSlrONS) = S.O / 7.5 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGSR'ONS) = 349.0 / S23.S <br />CEMENT FOR DRY ADDI770N TODAY (BAGSlrONSp O.O O.O <br />CEMENT ADDITION TO BACKFII.I. TO DATE (BAGS/I'ONS~ 131.0 163.8 <br />WATER USAGE AT BATCB PLANT (GAL TODAYR'O DATE) 98,000 / 3,996,041 <br />u <br />2. Results of Inspection: See Attached <br />3. Tests Required by Plans andlor Specs and Results: See Attached <br />Less than full shift; not all tests completed <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 200' <br />D. Wren dug 0' <br />CoMim:e diggirg slurry wa0 trench <br />6. Safety: No Safety ]slues. <br />CON'T'RACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />materiel and equipment used work performed a~ test ooaducted dtniag this reporthtg period were in <br />strict compliance with the contract plans and specificatiorrv except as noted. <br />Geo-Con <br />r1 <br />LJ <br />Inspector/ Engineer/ Owner <br />Page 1 of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.