Laserfiche WebLink
~~ Geo-Con <br />• DAH.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 1/9/2007 S M~T W R F S Weather. So®y Temp: 12-03 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF)= 2,880.0 <br />TOTAL AREA TO DATE (SF) = 305,078.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/1'ONS) = 17.0 / 25.5 <br />BENTONTfE FOR SLURRY TO DATE (BAGSlI'ONS) = 620.0 / 930.0 <br />BENTONITE FOR DRY ADDI770N TODAY BAGSrrON3) = 4.0 / 6.0 <br />BENTONITE FOR DRY ADDITION TO DATE BAGS/[ONS) = 344.0 / $ I6.O <br />CEMENT FOR DRY ADDI770N TObAY (BAGSrrONSp O.O O.O <br />CEMENT ADDTT[ON TO BACKFILL TO DATE (BAGSIrONSp 131.0 163.8 <br />WATER USAGE AT BATCB PLANT (GAL TODAY/r0 DATE) 98,000 / 3,996,041 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less than full shift; not eu tests completed <br />4. Verbal Insfitctions Received: <br />5. Remarks: D. Gayer 0' <br />D. Wren duA 100' <br />Dave and Dormie switched off, combined for 100' redig at 123+00 to 124+00 <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that dte above report is complete and correct and that a0 <br />material and equipmetn used, work performed and test conducted during Ibis reporiiog period were in <br />strict compliance with the contract plain and specificafto¢s except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Pa4e t of t <br />