My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOH.-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/9/2006 S M T W R FQS Weather. Sutmy Temp: 21fi0 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 2,900.0 <br />TOTAL AREA TO DATE (SF) = 187,$48.0 <br />BENTONITE FOR SLURRY TODAY (BAGS(I'ONS) = S.O / 12.0 <br />BENTONITE FOR SLURRY TO DATE (HAGS/TONS) = 4I O.O / G I S.O <br />BENTONITE FOR DRY ADDTTION TODAY (BAGS7rONS) = 9.O / l 3.$ <br />BENTONITE FOR DRY ADDITION TO DATE (BACSITONS) = 222.0 / 333.0 <br />CEMENT FOR DRY ADDI170N TODAY (BAGSITONS)= O.O O.O <br />CEMENT ADDI770N TO BACKFH.I. TO DATE (BAGS(fONS)= 54.0 67.$ <br />WATER USAGE AT BATCH PLANT (GAL TODAYlrO DATE) 6I,SOO / 2,$39,381 <br />2. Results of Inspection: See Attached <br />3. Tests Required by Places and/or Specs and Results: See Attached <br />Less than full shift; mt all tests completed <br />4. Verbal Instructions Received: <br />5. Remarks: PC1100 cot working today, waiting to cross water lire on Monday <br />D. Wren duce 100' <br />Cat 373 down at 1PM to repair bolts on hoist cylinder pin <br />6. Safety: No Safety Isms. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct atxl that all <br />material and equipment used, work performed and test cenducted during this reporting period were in <br />strict compliance with the contract plaffi and specificatiore except as mted. <br />Geo-Con <br />Inspector/ Engineer/ Owner <br />Page 1011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.