My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-COD <br />• DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 1/6/2007 5 M T W R I~ Weather: Sutary Temp: 124 <br />1 . Wnrk Pxfnm,etl: Cnmm»rv cee additirm attached <br />AREA TODAY (SF): 6,13S.O <br />TOTAL AREA TO DATE (SF) ° 300,16$.0 <br />BENTONITE FOR SLURRY TODAY (BAGSrrONS) = O.O / O.O <br />BENTOMTE FOR SLURRY TO DATE (BAGS/I'ONS) = 600.0 / 900.0 <br />BENTONTTE FOR DRY ADD1170N TODAY BAGSITONS) _ $.O / 12.0 <br />BENTONTTE FOR DRY ADDITION TO DATE (BACSfrONS) = 337.0 / SOS.S <br />CEMENT FOR DRY ADDTTION TODAY (BACSl1'ONS} O.O 0.0 <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGSITONS}= 131.0 ] 63.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAYlI'O DATE) SS,9OO / 3,89$,041 <br />• 2. Results of Inspection: <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />No tuixing a[ plant, mt all viscosity tests completed <br />4. Verbal Instmctions Received: <br />5. Remarks: D. Craver 140' <br />D. Wrendu& ]30' <br />No mixing at the plant today. <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and corzect and that ail <br />material and equipmem used, work performed and test conducted during this reportitg period were in <br />strict compliance with the contract plasm and spectftcatioffi except as noted. <br />Geo•Con <br />• Inspector/ Engineer/ Owner <br />See Attached <br />Page 1 0l t <br />
The URL can be used to link to this page
Your browser does not support the video tag.