My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />u <br />DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/20/2006 S M T ®R F S Weather. Blizzard Temp: IS-30 <br />1. Work Performed: Sttmm ,see addition attached <br />AREA TODAY (SF) = 5,41 O.O <br />TOTAL AREA TO DATE (SF)= 2$4,O 13.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/1'ONS) = 4.O / 6.0 <br />BENTOMTE FOR SLURRY TO DATE (BAGS/I'ONS) = SS2.O / $28.0 <br />BENTONITE FOR DRY ADD1170N TODAY (BAGSlrONS) = 6.O / I.O <br />BENTONITE FOR DRY ADDITION TO DATE (BAGSRONS) = 322.0 / 4$3.O <br />CEMENT FOR DRY ADDr170N TODAY (BAGS/I'ONSp 11.0 13.$ <br />CEMENT ADDTrrON TO BACXF7LL TO DATE (BAGS?ONSp 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAY(1'O DATE) S4,HOO / 3,5)4,141 <br />• <br />2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less than full shift; not all tests competed <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 90' <br />D. Wren dug 140' <br />Blizzard condition, shut down s[ noon Trencher delivered blade, we can4 unload-too heavy. Sending crare, <br />No production due to blizzard and Chris[mas/New Year holidays. CoMmue production 1/4/07 <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipment used, work performed and test conducted during this mPortinB period were m <br />striM compliance with the contract plan and specification except as rated. <br />Geo-Con <br />Inspector/ Engineerl Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.