My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~~~ Geo-Coo <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/18!2006 S®T W A F S Weather: Overcast Temp: 15-38 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 10,200.0 <br />TOTAL AREA TO DATE (SF7 = 265,363.0 <br />BENTONITE FOR SLURRY TODAY (BAGSlrON3) = 13.0 / 19.5 <br />BENTONITE FOR SLURRY TO DATE (BAGS/I'ONS) = S2S.O / 787.$ <br />BENTONITE FOR DRY ADDI710N TODAY (BAGS/I'ONS) = I O.O / 1$.O <br />BENTONITE FOR DRY ADDITION TO DATE (BAGS/EONS) = 301.0 / 4$ I .$ <br />CEMENT FOR DRY ADDITION TODAY (BAGSlrONS)= O.O O.O <br />CEMENT ADDITION TO BACKF'n,I. TO DATE (BAGS?ONS)= 108.0 135.0 <br />WATER USAGE AT BATCFI PLANT' (GAL TODAY/I'O DATE) 158,000 / 3,539,34 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 250' <br />D. Wren dug 160' <br />830 was told by Dave with Carrol Lang and Jose with Hogm we have to move the trencher from m from <br />of the gme to the work pad 100' south of where h was staged by the brash 700' imide the gate on west ead. <br />We have all equip except pc1100 and cat 373 to help move the ceumer weights, tracks, aml all other items <br />that were staged before we were told to move items. Finished moving items at 10:30. D. Gayer dug out several <br />large boulders 3' and 4', possbly causi»g a crack to run along trench between 91+10 and 90+20. Have pics. <br />6. Safety: No Safety Issues. <br />CON"I1tACTOR CERTIFICATION: I certify that the above report is complete atd correct and that ell <br />material and equipmem used, work performed and test conducted during this reporting period were io <br />strict compliance with the wntram plans and specificaziore except as rated. <br />G@O-COn <br />• <br />Inspector/ EngineeN Owner : <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.