My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/13/2006 S M T W R©S Weather: Stmrry Temp: 4069 <br />1 Wnrtr Pxfnrmxl• Cnmmarv aer addition attarhed <br />AREA TODAY (SF)= 10,23$.0 - <br />TOTALAREA TO DATE (SF)= 2$$,163.0 <br />BENTONITE FOR SLURRY TODAY (BAGSrI'ON~ = 13.0 / 19.5 <br />BENTONITE FOR SLUARY TO DATE (DAGSrI'ONS)= $12.0 / 768.0 <br />BENTONl1'E FOR DRY ADDTTION TODAY (BAGSITONS) = 12.0 / 18.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGSA'ONS) = 291.0 / 436.5 <br />CEMENT FOR DRY ADDTTION TODAY (BAGSJTONS)= O.O ~ O.O <br />CEMENT ADDITION TO HACKFII.L TO DATE (BAGSR'ONS~ 108.0 13$.0 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/f0 DATE) 1 SO,7OO / 3,381,341 <br />• <br />2. Results of Inspection: See <br />3. Tests Required by Plans and/or Specs and Results: <br />See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 250' <br />D. Wren dua 180' <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATTON: I certify that the alwve report is complete and correct and that all <br />material end equipment used, work perforated and test wndttcted during this reporting period were in <br />strict compliance with the cotnract platE and speci6catio~ except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Pepe t of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.