My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t~~.~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-$ENTONITE SLURRY WALL <br />CARMA $AYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/132006 S M T ®R F S Weather: Stymy Temp: 35-70 <br />7 _ Wtttk Perfnrtned• Cnmmarv see addition aHachecl <br />AREA TODAY (SF) = 10,68$.0 <br />TOTAL AREA TO DATE (SF) = 225,60$.0 <br />BENTONfrE FOR SLURRY TODAY (BAGSfI'ONS)= 19.0 / 28.5 <br />BENTONITE FOR SLURRY TO DATE (BAGSrrONS) = 476.0 / ~ 14.0 <br />BENTONITE FOR DRY ADDITION TODAY(BAGS/TONS) = 16.0 / 24.0 <br />BENTONTTE FOR DRY ADDITION TO DATE (BAGS/TONS) = 263.0 / 394.5 <br />CEMENT FOR DRY ADDTI70N TODAY (BACSrrONS)= 30.0 3T.5 <br />CEMENT ADDITION TO BACKFILL TO DATE (BACSfI'ONSJ= 95.0 1 18.8 <br />WATER USAGE AT BATCH PLANT (GAI, TODAYfrO DATE) 164,470 / 3,021,351 <br />.Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5, Remarks: D. Gayer 140' <br />D. Wren dug 230' <br />Changed bushings on PCI 100 end of stick <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above repon is complete and correct and that all <br />material and equipmem used work performed and test conducted durigg this reporting period were in <br />strict complimtce with the coact plans and specifications except as mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.