Laserfiche WebLink
t~~.~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-$ENTONITE SLURRY WALL <br />CARMA $AYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/132006 S M T ®R F S Weather: Stymy Temp: 35-70 <br />7 _ Wtttk Perfnrtned• Cnmmarv see addition aHachecl <br />AREA TODAY (SF) = 10,68$.0 <br />TOTAL AREA TO DATE (SF) = 225,60$.0 <br />BENTONfrE FOR SLURRY TODAY (BAGSfI'ONS)= 19.0 / 28.5 <br />BENTONITE FOR SLURRY TO DATE (BAGSrrONS) = 476.0 / ~ 14.0 <br />BENTONITE FOR DRY ADDITION TODAY(BAGS/TONS) = 16.0 / 24.0 <br />BENTONTTE FOR DRY ADDITION TO DATE (BAGS/TONS) = 263.0 / 394.5 <br />CEMENT FOR DRY ADDTI70N TODAY (BACSrrONS)= 30.0 3T.5 <br />CEMENT ADDITION TO BACKFILL TO DATE (BACSfI'ONSJ= 95.0 1 18.8 <br />WATER USAGE AT BATCH PLANT (GAI, TODAYfrO DATE) 164,470 / 3,021,351 <br />.Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5, Remarks: D. Gayer 140' <br />D. Wren dug 230' <br />Changed bushings on PCI 100 end of stick <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above repon is complete and correct and that all <br />material and equipmem used work performed and test conducted durigg this reporting period were in <br />strict complimtce with the coact plans and specifications except as mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 of 1 <br />