Laserfiche WebLink
Geo-COO <br />• DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 3l1R007 S M T W®F S Weather: Windy Temp: 2240 <br />1 Wnrlr Prrfnrmwl• Cnmmarv. eon addition aHanhed <br />AREA TODAY (SF) = O.O <br />TOTAL AREA TO DATE (SF) = 37$,091.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/I'ONS) = O.O / O.O <br />BENTONITE FOR SLURRY TO DATE (BAGS/TONS) = 7$1.O / 1126.5 <br />BENTONITE FOR DRY ADDr170N TODAY (BACS?ONS) = O.O / O.O <br />BENTONITE FOR DRY ADDITION TO DATE (BAGSfrONS) = 409.0 / 613.5 <br />CEMENT FOR DRY ADDITION TODAY (BAGS(I'ONSp $.O I O.O <br />CEMENT ADDr110N TO BACKFII.I. TO DATE (BAGSITONSp ] $9.O I9$.$ <br />WATER USAGE AT BATCR PLANT (CAL TODAYIrO PATE) O / 4,526,641 <br />2. Results oflnspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />Finished backfdliog trench m AM, ro tests completed <br />4. Verbal Instmctions Received: <br />$. Remarks: Bacld'dl complete, trexh complete <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the stave report is complete and correct and that all <br />material and equipment used, work performed and test conducted dining this reporting period were in <br />strict compliance with the contract plans and specificetiom except as rated. <br />Geo-Con <br />. Inspector/ Engineer! Owner <br />Page t of f <br />