My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-COO <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONTTE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 2/28/2007 S M 7®R F S Weather: Smw Temp: 12-33 <br />1. Work Perfnrrnerl- Rnmmarv see addition attached <br />AREA TODAY (SF) = 6,$ I S.O <br />TOTAL AREA TO DATE (SF) = 37$,091.0 <br />BENTONITE FOA SLURRY TODAY (BACSr[ONS) = O.O J O.O <br />BENTONITE FOR SLURRY TO DATE (BACS70NS) = 7$1.0 / 1126.$ <br />BENTONITE FOR DRY ADDITION TODAY (BAGSrIONS) = 1.O / 1.$ <br />BENTONITE FOR DRY ADDTI'[ON TO DATE (BAGS/TONS) = 409.0 / 613.$ <br />CEMENT FOR DRY ADDITION TODAY (BAGS/rON3~ I O.O . 12.$ <br />CEMENT ADDITION TO BACKFILI, TO DATE (BAGS(fONSp I S 1.O 18$.$ <br />WATER USAGE AT BATCH PLANT (GAL TODAY/f0 DATE) O / 4,526,641 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: Sce Attached <br />4. Verbal Instradions Received: <br />5. Rematlcs: Donnie dug 235' -completed all excavation on tremh <br />Tied into previouly excavated slurry wall <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTQ~TCATION: 1 certify that the above report is wmplete and coma and that all <br />material and equipmem used, work performed and test m~ucted during this reporting period were in <br />strict comphame with the contrail plans and speci0catiom except as mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 7 of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.