Laserfiche WebLink
Geo-COB <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 2212007 S ~ W R F S Weather. Sunny Temp: 26-59 <br />1. Wnrk Perfnnned_ Summary. see addition attached <br />AREA TODAY (SF) = 4,7S7.S <br />TOTAL AREA TO DATE (SF) = 371,276.0 <br />BENTONITE FOR SLURRY TODAY (BAGSJfONS) = 4.0 / 6.O <br />BENTONTI'E FOR SLLIRRY TO DATE (HAGS/TONS) = 7S 1.O / 1126,5 <br />BENTONITE FOR DRY ADDITION TODAY (BAGSrI'ONS) = 4.0 / 6.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGS/1'ONS) = 408.0 / 612.0 <br />CEMENT FOR DRY ADDITION TODAY (BAGS?ONS}= 10.0 12.5 <br />CEMENT ADDITION TO BACRFILI. TO DATE (BAGSII'ONS)= 141.0 176.3 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/I'O DATE) 36,200 / 4,526,641 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Resuhs: See Attached <br />4. Verbal Instructions Receival: <br />5. Remarks: Donoie dug 170'. Dug around water pipe all clear. <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTD[CAT[ON: I certify that the above report Is complete and correct and that all <br />material and equipmea[ used, work performed and test conducted duriog this ceportiog period were m <br />strict compliance with the conuac[ plam and specifications except as rated. <br />Geo-Con <br />• Inspector/ Engineer/Owner <br />Page 1 of 1 <br />