My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-COD <br />• DAILY INSPECTION/QUALTTY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 226/2007 S®T W R F S Weather: Swmy Temp: 23fi6 <br />1. Work Performed: Sutnmarv. see addition attached <br />AREA TODAV (SF)= ~ 3,73S.O <br />TOTAL AREA TO DATE (SF) = 366,51 S.O <br />BENTONI7'E FOR SLURRY TODAY (BAGSrrONg) = 3.O / 4.S <br />BENTONITE FOR SLURRY TO RATE (BAGSrTONS) = 747.0 / 112O.S <br />BENTONI'rE FOR DRY ADDITION TODAY (BAGS?ONS) = 6.0 / 9.0 <br />BENTONITE FOR DRY ADDI770N TO DATE (BAGS/1'ONS) = 404.0 / 606.0 <br />CEMENT FOR DRY ADDITTON TODAY (BAGS(1'ONSp O.O ~ O.O <br />CEMENT ADDITION TO BACKFII,L TO DATE (BAGSrfONSp I31.O 163.8 <br />WATER USAGE AT BATCH PLANT (CAL TODAYITO DATE) 32,400 / 4,490,441 <br />• <br />2. Results of inspection: See Attached <br />3. Tests Required by Plans and/or Specs anti Resuks: See Attached <br />Less than full shift; cot all tests completed <br />4. Verbal InsWCtions Received: <br />3. Remarks: Donnie dug I40' feet. Iowa 3.3 hrs for tnechemcal problems. <br />6. Safely: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that a0 <br />material and equipmem used, work performed and test wrdta:ted during this reporting period were m <br />strict complieme with the contract plan and specification except n mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.