My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-COB <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO~~-ICON PROJECT NO. POS-003 <br />Date: 224f2007 S M T W R rL~J Weather: Suety Temp: 21-SO <br />1. Work Performed: Summarv. see addition attached <br />AREA TODAY (SF)= 3,620.0 <br />TOTAL AREA TO DATE (SIB = 362,7$3.0 <br />BENTONITE FOR SLURRY TODAY (BACSfTONS) = 6.O / 9.0 <br />BENTONITE FOR SLURRY TO DATE (BACS?ONS) = 744.0 / ] I ] 6.O <br />BENTONTfE FOR DRY ADDTTION TODAY (BAGSlI'ONS) = 2.O / 3.O <br />BENTONTTE FOR DRY ADDITION TO DATE (BACSA'ONS) = 398.0 / $97.0 <br />CEMENT FOR DRY ADDITION TODAY (BAGSlrONS~ O.O ~ O.O <br />CEMENT ADDTTION TO BACKFILL TO DATE (BAGS7I'ONSp 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/f0 DATE) 42,800 / 4,4SS,O41 <br />• 2. Results of Inspection: See Attached <br />3. Tests Requited by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: Domie dug 120'. Down 2hr for hydraulic leak. <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTffICATTON: I certify that the above report is complete and correct atd that alI <br />material and equipment used, work performed and test conducted during this reporting period were m <br />strict compliance with the cetriract plmts aad speci6cationc except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page t of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.