Laserfiche WebLink
~~~ Geo-Con <br />• DAH.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. P05-003 <br />Date: 2/222007 S M T W®F S Weather. Sumry Temp: 23fi3 <br />1. Work Performed: Summary, see addition attached <br />AAEA TODAY(SF)= 6,765.0 <br />TOTAL AREA TO DATE (SF) = 354,048.0 <br />BENTONITE FOR SLURRY TODAY (BAGS7ONS) = 15.0 / 22.5 <br />BENTONrrE FOR SLURRY TO DATE (BAGS/TONS) = 733.0 / 1099.5 <br />BENTONITE FOR DRY ADDITION TODAY (BAGS/I'ONS) ~ S.O / 7.5 <br />BENTONTTE FOR DRY ADDITION TO DATE (BACSIfONS) = 394.0 / 591.0 <br />CEMENT FOR DRY ADDI770N TODAY (BAGSJTONS)= O.O O.O <br />CEMENT ADDI170N TO BACICFILI. TO DATE (BACSITONS)= 131.0 163.8 <br />WATEB USAGE AT BATCH PLANT (GAL TODAY/r0 DATE) 83,700 / 4,450,241 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Resuhs: <br />4, Verbal Instructions Received: <br />5. Remarks: Start Leadm at 14+50 aad be @ depth 14+g0. Domie digging. <br />Doric dug 240' <br />First day back digging since 219107 <br />6. Safety; No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and Otat all <br />material and equipment used, work performed and test conducted during this reportigg period were in <br />strict compliance with the wmract plans end specification except as mted. <br />Geo-Con <br />• Inspector/Engineer/ Owner <br />Page t of 1 <br />