My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-CoR <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/112006 S©T W R F S Weather: Sumry Temp: 21fi0 <br />1. Work Performed: Summarv_ see addition attached <br />AREA TODAY (SF)= 11,800.0 <br />TOTAL AREA TO DATE (SF) = 199,348.0 <br />BENTONITE AOR SLURRY TODAY (BAGS7'ONS) = 14.0 / 21.0 <br />BENTONITE FOA SLURRY TO DATE (BAGS/TONS) = 424.0 / 636.0 <br />BENTONITE FOR DRY ADDITION TODAY (BACS/TONS)= 1 O.O / 15.0 <br />BENTONITE FOR DRY ADDTTION TO DATE (BAGSITONS) = 232.0 / 348.0 <br />CEMENT FOR DRY ADDI710N TODAY (BAGSJTONS} O.O O,0 <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGS(rONS}- 54.0 67.5 <br />WATER USAGE AT BATCH PLANT (GAL TODAY?O DATE) 82,500 / 2,621,881 <br />Z. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instntctions Received: <br />5. Remarks: D. Gayer 2'70' <br />D. Wrea dug 210' <br />~I <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material end equiptcent used, work perforated aad test conducted during this reporting period were in <br />strict compliance with the contract plans oral specifications except as rated, <br />Geo-Con <br />• Inspector/ Engineed Owner <br />Page t of i <br />
The URL can be used to link to this page
Your browser does not support the video tag.