My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-COB <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 12/8/2006 S M T W I2^F S Weather: Suety Temp: t9-57 <br />1 Wnr4 Prrfnrmrd• Cummarv cep addition atfnrhetl <br />AREA TODAY (SF) = 11,905.0 <br />TOTAL AREA TO DATE (SF) = 154,64H.O <br />BENTOMTE FOR SLURRY TODAY (BACSIfONS)= I6.O / 24.0 <br />BENTONITE FOR SLURRY TO DATE (HAGSfI'ONS) = 402.0 / 603.0 <br />BENTONITE FOR DRY ADDr170N TODAY (BACSITONS) = 1$.O / 27.0 <br />BENTOMTE FOR DRY ADDIFION TO DATE (BACSITONS) = 213.0 ! 319.5 <br />CEMENT FOR DRY ADDFr10N TODAY (BAGS7'ONS)= O.O O.O <br />CEMENT ADDITION TO BACKFTLI. TO DATE BAGSII'ON S4.O 67.$ <br />WATER USAGE AT BATCH PLANT (GAI. TODAY/r0 DATE) 131,064 / 2,477,8$1 <br />• 2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer dug 240' <br />D. Wren dug 170' <br />Slurry trench was excavated azomd the mrth petroleum lice crossing <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTffICATION: I certify that the above report is wmplete and correct and Utat all <br />material and equipment used, work performed and test cmduc[ed during this reporting period were m <br />strict compliance with the contract plans and speci&cazioas except as rated. <br />Geo-Con: <br />• Inspector/ Engineer/ Owner <br />Paga 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.