My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11852
DRMS
>
Back File Migration
>
Report
>
REP11852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:51 PM
Creation date
11/27/2007 12:46:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978287
IBM Index Class Name
Report
Doc Date
10/6/1999
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0/05/1999 15:09 970641_ VALCO INC • PAGE 02 <br />Notiee of Intent to continue Mining operations <br />1120 c t LCC~ n MHC i'~ A a~ R r~bY <br />Permittee Name: Ve]co Gunnison Concrete Div <br />Permit No. M-78-287 ' <br />Operation Name; Veder Pit <br />Anniversary Dace= October 05,~~~q <br />Total: 5550.00 (Due do your Anniversary Oate) <br />1. a. Permitted acreage: ~ • S I~ - <br />h. County where mine is located: ti~~~+ < 0 41 <br />i <br />2. Hae this mine been granted TFTfPORA[~Y CESSATION STATU57 YES NO <br />Dose this mina opera [e MORE or LES~ Chan 1B0 days per yeaY' MORE 5S <br />i <br />3. Dose this mine have a phased reclamation plan? Yes NO <br />i <br />4. Total acres affected during the rey}ort year:+ <br />5. Total acres reclaimed for the repo~it year•• <br />6. Total number of acres in topsoil rgplacement stage: <br />a. Average thickness of topsoil r~plac ed: y/,~; <br />7. Total number of acres seedefl: ~ .1~-~- <br />a. Lief species seeded f, evading ~Fa to for report year on bask <br />B. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: ~ <br />9. The type and approximate quantity ebf fert~i l((i~'zer~, organic material oY soil <br />conditioners used for the report y~Ar:• T7^ +a <br />10. Eetimacetl total acres to be £ect2d in thQ next repot[ year <br />11 . COMMENTS ~ ~ ti n ~ ~~ V~ ~ ~ h <br />~v env <br />• Please ahew the location of the acteage for items 4 - 6 on your map•+. Indicate <br />the phases of the reclamation which have b¢en completed, correlated with your timetable. <br />For phased operations show dates extractiod ceased and dates reclamation began. <br />•• NOT;: If there have nOt been any chang¢s since the last annual report and you <br />previously submitted a map which correctly .'depicts the current acreage in items 2 through <br />6. Chen a new map ie utuieeee e\\a ry. HOweverf this must be stated a~ove.C <br />9ignAture: ~d~I Ddte:~~ ` J ~ ~~ <br />~T <br />Please Cype or print current contact name, imailing address, and phone number below: <br />Contact Name: Phone: ~ ~ Q l S <br />Company: ~ Q ~-~ Y\ ' FAX NO: `~S~ <br />Address: <br />' ~~ Q <br />Federal Tax ID No ar Sotial Secu rley No.:' <br />
The URL can be used to link to this page
Your browser does not support the video tag.