Laserfiche WebLink
According to C.R.S.. <br />the operator shall sub <br />reclamation accompli <br />during the upcoming <br />a report and map to e <br />the above elements n <br />If your operation is sub <br />provide with the Annw <br />1.13.7(1)(a): <br />(i) the conditi <br />(ii) what specs <br />standards and Envirom <br />(iii) plans for r <br />Please provide the add'. <br />(a) Per the rec <br />regarding the <_ <br />(i) Pe <br />staterrf <br />irrevoc <br />credit, <br />(ii) Pe <br />Deed ~ <br />indepe <br />any cis <br />and th <br />proofs <br />• ANNUAL REPORT ~ ~ ' <br />INSTRUCTIONS <br />32-116(3), and C.R.S. 34-32.E-I 16(3)(a), on the anniversary date of the permit each year, <br />a report and a map showing the extent of current disturbances to affected land, <br />d to date and during the preceding year, new disturbances that ar anticipated ro occur <br />u, and reclamation that will be performed during the upcoming y ar. Please attach such <br />ased annual report form. (An adequately labeled map that clearly delineates and includes <br />suffice for a written report.) <br />ct to the provisions of Temporary Cessation as defined in [he Ac~and Rules, you must <br />Report the following information as required by 2 CCR 407-1, 4 7-4, and Rules <br />of the operation at the time of cessation; <br />measures have been and will be implemented to comply with r lamation, performance <br />tal Protection Plan requirements, if they are part of your appro d application; and <br />of mining operations. <br />following information with your Annual Report, as <br />of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />of the value of the Financial Warranty, specifically: <br />the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(a), p ovide an updated <br />it regarding the sufficiency of the value of the financial warranty. Specifically, <br />ble letters of credit, Deeds of Trust, and security agreements, self insurance, salvage <br />nd firs[ priority liens on project related fixtures. <br />the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), p~rmits secured with a <br />'Trust or a Security Agreement, the operator shall submit an upd e, by a qualified <br />dent appraiser, indicating any changes in property value, and a st Cement summarizing <br />umstances which may affect the adequacy of the Deed of Trust, o Security agreement, <br />value of the property subject to either of these instruments. The port shall also provide <br />at there are no past-due property taxes. <br />(i) Pe the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), perm [s secured with an <br />Irrevoc ble Letter of Credit, the operator shall have the bank provide doc mentation in the form <br />of a bal ce sheet, certified by a CertiFed Public Accountant, demonstrat ng that the Letter of <br />Credit oes not exceed ten percent (10%) of [he bank's capital surplus ac ounts. <br />(ii) Pe the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), pe its secured by a First <br />Priorit Lien on any fixtures and Equipment, the operator shall provide a eport in sufficient <br />detail t fully describe the condition, value, and location of all pledged fi Cures and equipment. <br />(b) Per the requ rements of 2 CCR 407-I, 407-4, and Rules I.15(1)(c), all monito ng information <br />required as part of the approved permit application, to include the Environmental rotection Plan. (Please <br />note that if you re nut a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of our approved permit.) <br />