Laserfiche WebLink
• Mined Land Reclamation 7 December 11, 1989 <br />• <br />• <br />STATION U17 <br />August, 1985 404,311.88 1,442,097.44 6164.21 <br />July, 1986 409,311.92 1,442,097.39 6166.85 <br />November, 1986 404,311.95 1,442,097.43 6166.80 <br />July, 1987 404,312.12 1,442,097.47 6166.74 <br />October, 1987 404,312.17 1,442,097.42 6166.75 <br />June, 1988 404,312.11 1,442,097.54 6166.72 <br />November, 1988 404,312.19 1,442,097.43 6166.70 <br />July, 1989 404,312.36 1,442,097.31 6166.70 <br />November 1989 404,312.36 1,442,097.36 6166.70 <br />MEAN 404,312.12 1,442,097.42 6166.75 <br />STATION U18 <br />August, 1985 404,313.78 1,442,360.07 6158.62 <br />July, 1986 404,313.82 1,442,360.03 6161.22 <br />November, 1986 404,313.81 1,442,360.01 6161.24 <br />July, 1987 404,313.92 1,442,360.16 6161.14 <br />October, 1987 404,313.97 1,442,360.09 6161.18 <br />June, 1988 404,313.91 1,442,360.24 6161.13 <br />November, 1988 404,313.99 1,442,360.20 6161.15 <br />July, 1989 404,314.23 1,442,360.08 6161.14 <br />November, 1989 404,314.19 1,442,360.12 6161.11 <br />MEAN 404,313.96 1,442,360.11 6161.17 <br />STATION U19 <br />August, 1985 404,403.85 1,442,179.52 NA <br />July, 1986 404,403.93 1,442,179.46 6127.40 <br />November, 1986 404,403.93 1,442,179.46 6127.40 <br />July, 1987 404,404.05 1,442,179.53 6127.26 <br />October, 1987 404,404.12 1,442,179.47 6127.30 <br />June, 1988 404,404.01 1,442,179.59 6127.19 <br />November, 1988 904,404.12 1,442,179.50 6127.20 <br />July, 1989 404,404.42 1,442,179.33 6127.09 <br />November, 1989 404,404.39 1,442,179.36 6127.09 <br />MEAN 404,404.90 1,442,179.34 6127.09 <br />NOTE: Station U19 is a t5 Rebar along the access road to the <br />portal. The point was run ove r by equipment between November, <br />1988 end July, 1989 resulting in a shift in position. Note that <br />the coordinat es up to November, 1988 were consistent. The new <br />means reflect the values of July, 1989 and November, 1989 only. <br />iMeen Elevation does not include August, 1985 <br />