Laserfiche WebLink
nd arc (outtd to he intact <br />(?1 For the upcoming year, reclamation of the tinal slopes in the recently mined castcm <br />portion of the permit will be completed. Once this is dune, the site will be complete <br />regarding the linal grade tiu use as an industrial site. <br />(3) The reclaimed slope in the eastern part of the permit arcs will be reseeded and the <br />remaining slope in the southwest corner will be graded, tupsoiled and seeded. <br />(5) The current contact for this operation is: <br />Jason l3urkcy Phunc n (97U) 9'b-331 I <br /> <br />P.O. l3ox 17?9 <br />Edwards, Colorado 81 G32 <br />lin~lo.cd is a check for Sb88 for the annual Cce. <br />Sincerely, <br />~~9 ~~~~ <br />Greg Lewicki, P. E. <br />Cireg Lewicki and Associates <br />cr. Jason Burke <br />