Laserfiche WebLink
<br />Wlining <br />~~Explorallon <br />Engineering <br />~. <br />FRED M.JOHNSON,c.a.c. <br />GEOLOGIST <br />a. O. BOx 2162 <br />DURANGO. COLORADO 61301 <br />June 20, 1963 <br />T0: National King Coal, Inc. <br />Ollice 303 247-0118 <br />Resdence 247.3560 <br />SUBJECT: Quarterly Inspection, Huntington Ditch, Second Quarter 1983 <br />1) The second quarterly inspection of the Huntington Ditch, King Coal <br />Mine, La Plata County, Colorado was made on June 10, 1963. <br />2) The ditch was found to be in good condition. <br />An inspection was made of the Huntington Ditch on June 10, 1963. <br /> <br />Weather was cloud~~ and warm. Other than normal weed and native plant <br />growth, the ditch was found to be in satisfactor~~ condition. The ditch <br />was inspected for evidence of leakage and damage due to erosion and the <br />effects of underground mining. The purpose of this inspection was to <br />meet requirements established by the Colorado 1•fined Land Reclamation <br />Division for quarterly inspection of the Huntington Ditch. <br />~j~J/ <br />red M. John3d , C.P.G. <br />1 <br />