Laserfiche WebLink
West Elk Mine 2002 Annual Hydrology Report 7 <br />• Table 1 <br />Monitoring Frequencies <br />Re ular Monitorin Baseline Monitorin <br /> <br />Month <br />Flow Field <br />Parameters <br />Chemical Anal sis <br /> Janua <br /> Februa <br /> March <br />Rising Limb -Apr 3 to May 13 Aril * * * <br />Peak Flow -Apr 21 to June 26 Ma <br />Low Flow -Jul 10 to Oct 8 June <br /> Jul <br /> Au ust <br /> Se tember <br /> October <br /> November <br /> December <br />3.1 Surface Water Mouitoring <br />• The surface water monitoring system for the Project includes 17 stream stations, including 10 <br />continuous recording sites and 7 sites with instantaneous flow measuring devices. The surface <br />water monitoring system remains the same as in WY2001. The locations of the monitoring sites <br />are shown on Map 2. A summary of the surface water monitoring is presented in Table 2. <br /> <br />Project # 00301 HydroGea, Inc. <br />