Laserfiche WebLink
+f RECE0.!ED <br /> JUN 2 7 2001 <br /> Deremo Snyder Annual Report <br /> 2000-2001 Division of Minerals and Geology <br /> The petroleum contaminated soils (PCS) treatment area was tilled during the summer <br /> months of 2000. The State of Colorado Department of Health and Environment granted <br /> Umetco permission to reclaim the area where the PCS were excavated. The excavation <br /> was backfilled, and a monitoring well in the area was also reclaimed. <br /> Brush piles were bumed. Drainages near the D-2 mine spoils pile were improved. <br /> Disturbed areas were seeded. <br /> A site map is not included because there have been no significant changes at the site. <br /> During the coming year the PCS will be treated during the summer months, and the site <br /> will be monitored for stability and vegetative growth. <br />