My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11120
DRMS
>
Back File Migration
>
Report
>
REP11120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:29 PM
Creation date
11/27/2007 12:35:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Report
Doc Date
9/8/1981
Doc Name
MINOR REVISION REFUSE PILE
From
MLRD
To
OSM
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_4_ <br />2. "Smooth and grade the ground surface to drain towards the toe ' <br />'. drain. The existing ponds should be removed as part of the <br />• initial construction. " <br />• ~ ."3. Construct the toe drainage system. <br />~..;,4. After the toe drain is in place, we recommend dozing the exist- <br />". - ing pile across the area along the north and west perimeter to , <br />+ develop a relatively level surface with a maximum thickness of <br />~. ~ ~ spoil of 2 feet. +This area should be tested to determine the <br />` compaction is achieved initially.- - ~ i <br />~. <br />' ~ .5. As spoil is developed, the haul trucks should be routed. over <br />., the pile with a dumping sequence from north to south. The .. <br />• piles should be leveled and compacted on a 3 "to 6 month inter- <br />~' val depending on the area being worked. When the piles of s"' <br />.'loose material are leveled and compacted, we recommend obtain- <br />ing compaction tests in order to have the data necessary far.- <br />required periodic certification of the fill. <br />• 6. The fill should be compacted to at least 90 percent of the <br />. maximum density determined using AASHTO T-99. We believe this <br />can be accomplished by using either a loaded clump truck or <br />vibratory compaction equipment. <br />7. Steps 5 and 6 should be continued until the top of the pile <br />• .. reaches elevation 6330. <br />• '~8. Before raising the bank elevation above elevation 6330, the <br />- surface diversion ditches should be constructed as indicated on <br />the construction plans. <br />9. Steps 5 and 6 can be continued until the design height of the <br />• pile is achieved. <br />At all times during construction of the pile, the top of the pile should <br />• be sloped at grades less than 1 vertical to 20 horizontal. All low <br />_ spots in the top of the pile which could trap surface water should be <br />• '~ eliminated. <br />. , <br />• ~.... <br />~.. ". <br />,~. , <br />Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.