Laserfiche WebLink
RE~~p~~~ <br />- Colorado Division of Minerals and Geolog~ARO3zoo5 <br />Annual Reclamation Report for the Year 2004 0;~;.~;~ <br />n of Ninerals and Ceolc.•- <br />Golden Eagle <br />mine name <br />81-013 <br />permit # <br />Basin Resources, Inc. <br />Permittee <br />Address: 2 North Cascade Ave.,l4th Floor, Colorado Springs, CO 80903 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed 59.45 0 59.45 <br />Acres backfilled and raded 58.25 1 .2 59.45 <br />Acres to soiled 58.25 1 . 2 59.45 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or Greater than <br /> Total ear Total' less 10 ears' <br /> 58.25 1.2 59.45 59.45 0 <br />Acres seeded' <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres disturbed 66.17 and the number of acres: <br />Phase I released 58.12 Phase II released 58.12 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas 3 0 <br />'(exGude acres where Phase III release has been achieved) <br />0 <br />~ InWudes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />wllector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking: coal stkrdkpllea, bading, and processing areas; railroads; coal conveyors; refuse piles end <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; end noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />0 <br />Phase III released 6.72 <br />' InGudes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />