Laserfiche WebLink
New Elk Mine <br />of Potential Failure or Instability: <br />I <br />Surface and outslopes of the pile were inspected for visable signs of potential failure or <br />instabilityi None were observed. 4 <br />1 <br />Threat toy Human Life or Property: illy <br />I <br />Failure cduld impact persons or equipment on or adjacent to the disposal area. <br />i l <br />Potential (Harm to Land, Air, and Water Resources: <br />Failure could impact the Purgatoire River. <br />Maintenance Required: <br />None required at this time. The active surtace area was regraded in 200A improve drainage and <br />compacted with a D-8 dozer. A "Rolling Compaction" test will be conducted as soon as <br />equipment is available and before additional material is placed on the pile. (Haul truck is <br />scheduled for late July for Pond 8 clean-out). <br />Supporting Documentation: (Compaction tests, surveys, photographs, field measurements) <br />No change in conditions since previous inspection. <br />Inspector <br />~r 25~n <br />Date <br />~.. <br />,, <br />_ '- <br />P/ <br />^ <br /> .. _. _ ` <br /> } <br /> ^. F~ <br />~,' :,~ <br />':~_, - ° . <br /> <br /> <br /> <br /> <br />Page 2 of 2 <br />