My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP10635
DRMS
>
Back File Migration
>
Report
>
REP10635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:40:03 PM
Creation date
11/27/2007 12:28:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986047
IBM Index Class Name
Report
Doc Date
4/14/1995
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~~~ <br />III IIIIIIIIIIIIIIII • <br />Notice of Intent to Continue Mining Operations <br />110(2) Annual Report <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />Phillips County <br />M-86-047 <br />'~ RFCFi~F~ <br />05/05/95 t u/L~~~O"oi,y ,9199,E <br />$225.00 (Due on your Anniversary Date) mO'9i,B <br />1. a. Permitted acreage: 5 b. County where mine is located: Ph;~~oA~_ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE LESS <br />Does this mine have a phased reclamation plan? YES NO <br />Total acres affected during the report year:' O. S <br />Total acres reclaimed for the report year:* - <br />Total acres in various stages of reclamation:* <br />a. Backfilled: - d. Topsoil replaced: - <br />b. Graded: - Average topsoil thickness <br />c. Seeded: - replaced: - <br />List species seeded & seeding <br />rate for report year on back <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />Estimated total acres to be affected in the next report year:* U[vtcrlowN <br />9. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />*• NOIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~e,,,,L, ~F/aa.1.~ Date: ~~~3~95'~ <br />Please type or print current contact name, mailing address, and phone number below <br />COntdCt Name: Randv Schafer / Phone: ( 970) 854-3778 <br />Company: Phillips County <br />AddreSS: 22I S. Interocean <br />Holyoke, CO 80734 ~,11V ~~9h <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.