Laserfiche WebLink
<br /> <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br /> <br /> <br />1 <br />1 <br />1 <br /> <br />1 <br />1 <br />1!^ctml~Frf ~rtt~ ~.SSII~I~~FS <br />CCNS;ii?.di,",~ G3CT 3Cg?i:CAL. =>i;7 _`if2=33 t':7 }!a='===?_, T=S:'=)iG <br />DAILY FIELD REPORT <br />PROJECT NUMBER D95263N1T DATE 1 2;1 /95, Friday <br />PROJECT NAME Oak Ridge Energy <br />PROJECT LOCATION Durango, CO <br />CLIENT Goff Engineering <br />CONTRACTOR Durango Construction <br />TECHNICIAN N. ~':'est <br />WEATHER CONDITIONS <br />Sunny and cool <br />WORK REQUESTED <br />Field Density Tasting <br />FOREMAN John Griffith <br />WORK PERFORMED 6Y LAMBERT AND ASSOCIATES RErRESEi~iTATi~i.= (r,~JD nEi~~i.=,n;:S, <br />I arrived at [he Oak Ridge Energy reclamation sRe a[ 3:.0 p.m. After <br />investigating the sit;., I spoke vvi[h Nlr. John Griffh:h, Durando Constructior„ <br />concerning the desired tes[ locations. I performed field density tes~s cr. or;;ious!•; <br />placed and rolled ma[erial on the upper fill level v~;hich had peen rar~ila~~ ~~[ar cr~~;iG.a <br />[a5L5. The teSiS D°ff Ofined PJda`/ aft, f~teSiS Of Lf'~e areas tasLad Cn ~;C`:'"": ~~3' I C. <br />19°5. I reported the results to I~rlr. John GririLh. Durangc Con;;ructicn, a^d iefL tna <br />site. I returned to the office aL 5:00 p.m. <br /> <br /> <br />s <br />1 <br />