<br />DATE: February 20, 1997 RESOURCE
<br /> Rnv Rome,
<br />~.,,..~.,~„~,
<br />T 0 :
<br />Susan Burgmaier ~ h„
<br />
<br />~ ~~~
<br />~~ ,,,,,,,,,,,,,,
<br />,,,,,,
<br />F.e,,,~,„•~,,,e,~n,
<br />
<br />FROM: Jim Pendleton
<br />'~-- iLL:'`G nwn,udH lung
<br />I),nnnl>,"•,,,,,
<br />RE: "Review of xis ~ g Compaction Data and Testing
<br />Frequency for the Existing Refuse Pile, Southfield Mine -
<br />Florence, Colorado" by TerraMatrix, Inc.
<br />(Permit No: C-81-014)
<br />In accordance with your request I have completed a review of the above
<br />referenced report prepared for the Southfield Mine by TerraMatrix, Inc., a
<br />geotechnical consultant. The Division recently directed the mine to address the
<br />possibly substandard compaction results submitted for the coal refuse pile at
<br />the Southfield Mine. In preparing my review I have also revisited a similar
<br />reanalysis of the Southfield Mine coal refuse pile prepared in 1992 by ACZ, Inc.,
<br />a former geotechnical consultant to the operator.
<br />The Situation at the Southfield Mine Coal Refuse Pile
<br />The permit, as amended in 1992, specifies that coal refuse will be placed and
<br />compacted in two foot lifts. A thin lift of fine coal refuse was to be placed and
<br />then covered with coarse refuse to a combined thickness of two feet. The
<br />combined material was then to be compacted to 90% relative density.
<br />TerraMatrix reports; "However, based on TerraMatrix's observations actual
<br />placement practices have been slightly different. Fines are generally being
<br />placed in one-foot lifts followed by a two to four foot lift of coarse refuse. The
<br />fine lifts were not compacted. However, the coarse lifts were compacted by a
<br />dozer with a pull behind sheeps-foot compactor. Additional compaction was
<br />provided from truck traffic."