Laserfiche WebLink
I ~ RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PIS,E I.D. N0. 1211-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD N0.9 EXCAVATION) <br />DATElI'IME: /~~ 7~4 3 - <br />INSPECTOR SIGNA <br />INSPECTOR TITLE: ~y/+' . ~~r- <br />Under the superv~s~on of Michael W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />~A. Stability of fill (quarterly inspection) <br />_B. Critical construction periods: <br />I. Removal of all organic materiaUtopsoil <br />_2. Placement of underdrainage system <br />_3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />• <br />_5. Revegetation <br />