Laserfiche WebLink
North Thompson Creek Mines <br />Acres Dimensions/Notes Date Reclaimed <br />Retuse Pile 8.0 1986 <br />Retuse Pond and P-9 1.7 Nol Reclaimed <br />No. 3 Mine 4.4 1987 <br />No. 3 Mine Pipeline To No. 1 Mine 0.3 Permanent <br />No. 1Mine Fan Site 0.8 1987 <br />Reclaimed Pond P-1 0.1 1994 <br />Reclaimed Pond P-3 0.7 1994 <br />Reclaimed Pond P-4 0.1 1994 <br />1`J`J4 <br />Reclaimed Pond P-7 & 8 0.5 1994 <br />Stoney Ridge Power Line 1.3 3740 15 1987 <br />Total Mine Site 47.4 <br />Reclaimed 1986 Reuse Pile 8.0 <br />Reclaimed 1987 31.5 3.8 Permanent <br />Reclaimed Ponds 1994 2.3 Permanent County Road Ditch <br />Permanent 5.6 <br />Total Mine Site 47.4 <br />0.9 270 150 <br />Corridor Bench 1 <br />0.5 400 50 <br />Subtotal Reclaimed at Loadout 1.8 Acres <br />Total Loadout 15.6 <br />Total Acres Disturbed Mine &Loadout 63.0 63.1 <br />Lona Term <br />Refuse Pile Pond 1.3 <br />Pond P-9 0.4 <br />To No. 1 Mine <br />Paved Road to Prime Farmland 9.2 <br />23.4 <br />" Reclaimed then Converted [o Permanent 3.9 <br />Permanent 19.5 <br />Total Permanent 23.4 <br />