Laserfiche WebLink
discharge will be monitored once a month for conductivity, flow, <br />pH, and temperature. A lab sample will be obtained once a year if <br />a discharge occurs to be analyzed for the chemical parameters <br />listed in the DMG Mining and Reclamation Permit. There has been no <br />discharges of water from the steel pipe as of the date of this <br />report. <br />3 <br />