Laserfiche WebLink
• Table 1.2-1 <br />Hydrology Monitoring Requirements -New Elk Mine <br />Water Level Field Short NPDES <br />Site or Flow Measurement* List* List <br />PRS-1 S S A <br />PRS-4 (aka NE 080) S S A <br />TH-201 Q <br />TH-202 Q <br />TH-203 Q <br />PAW-1 S S A <br />PAW-2 S S A <br />PAW-8 S S A <br />PAW-9 S S A <br />NEW-2 S A A <br />NEW-3 S <br />NEW-4 S A A <br />NPDES Stations: <br />NE-004(Pond) ++ ++ <br />NE-007 (Pond) ++ ++ <br />NE-008 (Pond) ++ ++ <br />NE-080 (PRS-4) ++ ++ <br />KEY: <br />Q =Quarterly (February, May, August, November) <br />A =Annually (November for all sites except intermittent and ephemeral strems for <br />which storm events will be collected). <br />S =Semi-Annually (May, November) <br />•See Table 28 for parameters included in each suite. <br />=++See NPDES permit for frequency and parameters. <br />• <br />5 <br />