Laserfiche WebLink
Table 2. Trapper Mine 1982 Quarterly Groundwater Field Parameter Summary Based <br /> on List D (Table 4.8-12) from Trapper's OSM Permit Appl ication (1) <br /> WELL SITE DESIGNATOR <br />PARAMETER GD -2 GF-4 GF-6 <br /> Quarter of Year <br />1 2 3 4 1 2 3 4 1 2 3 4 - <br />(3) (3) (3) 6.55 (3) (3) (3) 9.2 (3) (3) (3) 7.1 <br />~nductivity( umhos/cm) 1230/16° I 1140(12°) 1140(24) <br />Temperature (°C) ~ 8.0 1 5.5 ~ 7.0 <br />Bicarbonate (mg/1) (4) 736.9 (4) 630 (4) 629.5 <br />Elevation (feet above (S) (5) (5) (5) 6757.4 6762.7 <br />MSL ) <br /> <br />~;) OSM Permit as submitted January 1981 and revised through Adequacy Responses 1-12 (July 28, 1982) <br />:2) Eight quarterly parameters repor ted on annual monitoring summary Table 3. <br />(3) Not yet installed. Installation in late August 1982. <br />,~) New well sites not completed and baited clean until end o f September 1982. <br />(~ Flowing artesians without water elevation measurements. <br />hSH/js <br />1/28/83 <br />4' <br />