Laserfiche WebLink
<br />• <br />c <br />Ul <br />O <br />.0 <br />a <br />m <br />s <br />c <br />0 <br />E <br />`o <br />c <br />a <br />a <br />m <br />0 <br />r <br />Figure 9. Total Precipitation for 6 Previous Months <br />(1987 to 1990) <br />10 <br />Peabody Coal Seneca II Mine <br />1988 <br />1989 <br />1990 <br />/1987 <br />i <br />9 <br />8 <br />7 <br />6 <br />April May June July August <br />• <br />Months <br />30 <br />