Laserfiche WebLink
iii iiiiiiiiuiiiiii <br />RECEIVED <br />April 16, 1998 <br />Mr. Jiin Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />APR 2 0 1998 <br />Division of Minerals S Geology <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />April 12 - April 18, 1998 <br />Dear Mr. Dillie: <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of April 12 - <br />Apri1 18, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.011 ppm CN-wad and 0.397 <br />ppm CN-total. The collection pond averaged 0.029 ppm CN-wad and 0.052 <br />ppm CN-total. <br />Sincerely, <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />Pile <br />