Laserfiche WebLink
<br />Operations Description - Rules 2 05 2 2 OS 3(1) 2 05 3(2) and <br />4.01 <br />1. Stors~ King Mines is providing an insert page to the <br />application text commiting to submittal of detailed plans for <br />escapeways and raises prior to construction of said escapeways <br />and/or raises. (see page 4-26a, rev. December 14, 1984) <br />2. Storm King Mines is preparing a revised map showing the <br />permit area (5-year), affected area, and disturbed area for Phase <br />"A". The sec;uence of mining during Phase "A" is outlined on <br />revised Figure 4.7_-6 entitled ~•line Plan Longitudinal Section and <br />RigUra d~z-[} g;,eracion Plan. ?ire 3ff eCted area fOL 9'f135e "~° i5 <br />shown to include rock tunne'_s, r~iine workings and a possible zone <br />of subsidence. These revised figures are enclosed with this <br />letter for inclusion in Permit documents. <br />3. The ~,ia ter cask sho~.an on ..r =~.ving 7-3, page 4-~3o is a <br />pre-existing fiberglass sub-surface ?otaN'_e water tank which <br />S~1 pp_le5 the RiverbeilC Subd 1'v 1510n. This ?re-existing f3Cl llty <br />h=_s .no connection with the Coai Ridge ?~JD or the Coal Ridge Fline. <br />The only reason it Baas mapped on page ~?-63o was to assist with <br />assessing any effects to be 3ntiClp3ted from the limited blasting <br />a350C 13ted 4i lth rOCk tunnel developre nt. <br />Roads - '.u'_es ~.~5.3(3) and d.S3 <br />1. Storm King 'tines is providing an insert ?age (attached) <br />deSCCibing t[]e company'3 COmmltment t0 CertiflC3LlOn Of the <br />a;;C eSS road by a registered professional engineer. (see pages <br />4-11 and 4-lla). <br />2. For that portion of the access road re ,aired to develop <br />