Laserfiche WebLink
A <br />The required repairs to County Road No. 33 resulting from previous subsidence in the 6- <br />Right and 5-Right longwall panels were completed in late October 1999 by the Routt <br />County maintenance department at TCC expense. <br />TCC's replacement of dwelling #2 is near completion with occupancy scheduled for early <br />March ?000. The original dwelling and foundation were removed and backfilled. Anew <br />sectional home on a new foundation was provided to the north of the original dwelling. <br />The replacement dwelling will be serviced by a new potable water well and propane <br />heating system. Additional/final grading around the replacement foundation will be <br />completed in the spring as weather and ground conditions improve. TCC and the owner <br />of dwelling #1 (small cabin) have mutually concluded that no repairs to the cabin are <br />required at this time. <br />992ndHalfSubReport.doc Page 2 of 2 02/01/00 <br />