My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09984
DRMS
>
Back File Migration
>
Report
>
REP09984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:28 PM
Creation date
11/27/2007 12:17:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980201
IBM Index Class Name
Report
Doc Date
10/19/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ III IIIIIIIIIIIIIIII <br />RECEIVED <br />Notice of Intent to Continue Mining Operati s <br />Permittee Name: Mathias Concrete Inc <br />Permit No. M-80-201 <br />Operation Name: O'Bannon Pit* <br />Anniversary Date: October 23, 1998 <br />Total: $550.00 (Due on your Anniversary Date <br />1. a. Permitted acreage: ~~ ¢ n <br />b. County where mine is located: l~I ro (O gun d~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. - Total-acres affected. duri ng_the. reoort _year:* _ __ _ ___ <br />5. Total acres reclaimed for the report year:* <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />OCT 1 9 1998 <br />OF <br />~~ <br />,~ <br />~ o <br />YES NO <br />MORE LES <br />ES NO <br />~- Z <br />02 <br />7.s <br />~// <br />7. Total number of acres seeded: _ <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: _ <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers,~/organic material or soil <br />conditioners used for the report year:* /{'~ <br />10. Estimated total acres to be affected in the next report year:* ~~r ~, <br />11 . CONIIdENTS : ~ I/Y~(~ h n /~CUNS /~7 ~ // ~io ~Qc~P.~ /!.( / /. /~ <br />P~ / 9 97 <br />* Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you ~ -- - <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />/-1 / <br />Signature: rrSay/1 ~ lll(%/L=. Date: ~ C/~~~ <br />Please type or print current contact name, mailing address, and phone r~numberp~berlow: <br />Contact Name: i/>rirr N~l.( {/.lc Phone: ( ~//g 1~X `fi7' 3~f7~ <br />Company: YL1Gr f.Gp ir~c ~ia.n..e Ee ~..,. • FAX NO: ~9/A 1 ~So'2- ,~~ <br />Address: /~"7X e7/„/ <br />f4 <br />Federal Tax ID No. or Social Security No.: ~~~..7 ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.