Laserfiche WebLink
<br />//~ Kennecott <br />~ . Energy Memorandum <br />Co(oavyo CoalConrpanyL.P. ' <br />RECEI~I~O <br />'APR 13 2001 <br />FOR: File April 9, 2001 <br />~IVISIOn of Minerals G Cc_ , ~;• <br />West Pit Fill Construction Renort <br />During the quarter beginning January 1, 2001 and ending March 31, 2001, <br />I inspected the area in which the West Pit Excess Spoil Fill is being <br />constructed. The purpose of these inspections was to inspect the fill surface <br />for vegetative efforts; inspect the fill for areas of water seepage or surface <br />drainage and to satisfy the requirements of CMDG.. Rule 9.09.1(lla). <br />During the quarter no progress was made on the West Pit Fill. No <br />overburden was hauled to backfill in the West Pit due to spoil room <br />constraints. The 7250 ditch has been re-established as a drainage ditch so <br />that water can run across the face of the fill and down the surface rock <br />drain. In the fourth quarter of 2000 there were 10.1 acres of reclaim <br />accomplished on the south west corner of the fill area just outside the mining <br />limit. I overlooked this in the fourth quarter 2000 report. <br />Attached to this report are my certification that all construction <br />requirements have been met thus far in constructing the West Pit Excess Fill. <br />Step ~nkem` <br />Technical Services Manager <br />cc. West Pit Fill Construction Engineering Report <br />