Laserfiche WebLink
I• <br />The annual chemical analysis for LO-1 shows a slight increase in nitrates and bicarbonates while <br />other constituents has a slight decrease. <br />For OW-14 there is a slight decrease in the level of all constituents analyzed. <br />• <br />• <br />VULCAN DITCH <br />• <br />For No. 8 the analyses showed that the level of most constituents went down except for potassium <br />and nitrates, which increased. <br />PROJECT WATER BALANCE <br />Flow in the Vulcan Ditch began June 19, 1993 and continued to September 28, 1993. All water <br />diverted by the ditch was used for agricultural purposes only. <br />Records maintained by the Division Engineer show that diversions were made for June 19, 1993 <br />through September 28, 1993, with a total of 1,552.9 AF diverted <br />• <br />MINE USES <br />The Coal Ridge No. 1 Mine did not use any water during 1993. <br />Respectfully submitted: <br />RESOURCE ENGINEERING, INC. <br />~. <br />aul S. Bussone, P.E. <br />Water Resource Engineer <br />PSB/mmm <br />~ 447-1.0 ewd~a..oerewa <br /> <br />2 <br /> <br />1 '1 <br />~~ <br />David L. Smith <br />Engineering Technician <br />..... <br />""'RESOURCE <br />..... <br />..... <br />~~~~~ E N G i N E E P i N G I N G <br />