My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09780
DRMS
>
Back File Migration
>
Report
>
REP09780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:19 PM
Creation date
11/27/2007 12:14:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Report
Doc Date
10/12/1999
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ANNUL REPOR' <br />.. ..... ... INSTRUCTIONS <br />i\ccording [o C.R.S. 3-4-3_-I 16(3). and C.R.S.:-1-3_.~-I 16(=)(a), on the anni+~enarv date of the permit each year, <br />the operator shall submiut repun and a map showinv the extent of current disturb:mzes to affected land. <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year. and reclamation that will be performed durim the upanning year. Please attach such <br />a report and map ro zncloseJ annual report form. (.An adequately labeled map that clearly delineates and includes <br />the above element may suffice fora ++ritten repon.) <br />If your operation is subject to the pruvivons of Temporary Cessation as defined in [he Act and Rules, you must <br />provide with the Annu:d Report the following information as required by 2CCR -107-1, -107--1, and Rules <br />I.li.7(1)(al: <br />(I) the condition of the apzre[iun at the time of cessation; <br />(iij what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Em'ironmental Protection Plan requirements, iF they are part of your <br />approved application; and <br />(iii) plans' for resumption of minis; operations. <br />Please provide the additional following information with your Annual Report, as applicab <br />(a) Per the requirements of 2CCR -107-1.407-4, and Rules I.I ~(I ), provide an updated statement <br />resardine the sufficiencv of the value of the Financial W.vranty, suecific;tlL~: <br />(I) Per the requirements of 2CCR 407-L 407-4, and Rules L l i(I)(aj, provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically. <br />irrevocable letters of credit, Deeds of'frust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the reyuirements of 2CCR -107-1, =107-~1, and Rules 1.1 ~(1)(b), permits secured with a <br />Deed of Trust or a Securit}' Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect [he adequacy of the DeeJ of Trust, or Security Agreement, <br />and the value of the property subject to zither of these instruments. <br />The report shall also provide proof that there are no past-due property taxes. <br />(iii) Pzr [hz requirements of 2CCR 407-1, 407-4, and Rules =1.7(3), permits secured with an <br />Irrevocable Lzuer of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that [hz <br />Letter of Crzdtt dots not exceed ten percent (109c) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2CCR 407-1, 407-4, and Rules' d.93(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of ?CCR 407-I. 407-4, and Rules I.I (;(I)(z ~, all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plun. <br />(Please note that if you are nut a Designated Ivlining Operation, you will not have an Environmental <br />Protection Plan as part of your approved pemtit.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.